    Uttam Strips' management wanted machine-wise visibility on their AIDA 5 stamping press: who was deployed, what was produced and why it stopped. VIZO361° answered all three from three existing cameras — automated rotor / stator counting, 60-second inactivity detection per belt, required-vs-observed manpower and attendance by face.

    At a glance

    One press, three cameras, four outputs

    Customer
    Uttam Strips
    Site type
    Stamping division — rotor and stator production
    Machine
    AIDA 5 press (3 conveyor belts: Belt 1 rotor, Belt 2 stator, Belt 3 stator)
    Cameras
    3 — conveyor camera, workforce camera, wide camera view
    Scope
    POC scope supplied by Uttam: production counting, machine downtime, manpower monitoring, attendance by face
    POC period
    October 2026 (shift evidence from 6–7 October; period view 1–8 October)

    The challenge

    Management wanted machine-wise visibility

    Uttam Strips runs rotor and stator stamping on an AIDA 5 press. Management had an approved machine roster, a required staffing level and a production plan, but no independent record that connected the three at the machine. The questions put to the POC were simple to ask and hard to answer from the shop floor: who was actually deployed at AIDA 5 during each shift, what did the press actually produce hour by hour, and why did it stop when it stopped?

    What was planned?

    Required staffing, assigned operator and the approved machine roster.

    What was observed?

    Production counting, camera-area availability and production inactivity.

    What needs action?

    Staffing gaps, operator cover, stop reasons and resource allocation.

    The management purpose, in the customer's own framing: connect deployment, production and downtime to machine-wise performance and cost review — using the observations together with approved payroll and allocation records.

    What VIZO361° does on AIDA 5

    Four outputs from three existing camera views

    Conveyor camera

    • • Automated production counting
    • • Production inactivity
    • • Direct-pickup evidence

    Workforce camera

    • • Required 4 staff + 1 operator
    • • Area presence and shortages
    • • People attendance evidence

    Wide camera view

    • • Wider machine context
    • • Live supervision
    • • Visual review of the machine area

    Three camera views support one AIDA 5 setup. Camera count and conveyor-belt count are different: the press has three belts (Belt 1 rotor, Belt 2 and Belt 3 stator) covered by one conveyor camera.

    Scope 01

    Production counting

    Automated rotor / stator output by hour and by shift for production review.

    Each part crossing the conveyor is counted from the camera. The shift report shows date, shift window, hourly rotor count, hourly stator count and total quantity; the dashboard adds hourly and belt-wise trends and a selected-period view.

    Scope 02

    Machine downtime

    Inactive periods identified per belt so the line team can explain each stop.

    DOWN means no recorded part crossing for 60 seconds — the report measures production inactivity, not a fault code. Every interval has a clear start and end time (IST). Belt intervals overlap, so they are reviewed belt-wise and must not be added into a single machine-breakdown total.

    Scope 03

    Manpower monitoring

    Required deployment (4 staff + 1 operator) compared with observed availability.

    The workforce camera reports how long at least 4 staff were visible, how long fewer than 4 were visible, and how long the designated operator area had no person in it. Operator availability is reported separately so it does not inflate the four-person staff count. Staff-shortage and operator-presence alerts fire during the shift.

    Scope 04

    Attendance by face

    Named presence, assigned shift and first / last seen for roster review.

    A named attendance card with the assigned shift, the time of the first and latest camera observation, and the camera frame to cross-check the entry. Observation times do not establish continuous time working at the machine.

    Shift evidence

    What two shifts on AIDA 5 recorded

    Day shift: 6 Oct 2026, 07:00–19:00 IST. Night shift: 6 Oct 2026, 19:00 – 7 Oct 2026, 07:00 IST. All figures are as recorded by the system and saved in the day / night production, downtime and manpower reports.

    ObservationDay shiftNight shift
    Production
    Rotor counted9,8918,005
    Stator counted9,5897,892
    Total parts19,48015,897
    Downtime (per belt, overlapping)
    Belt 1 · Rotor — DOWN2h 36m 52s4h 07m 20s
    Belt 2 · Stator — DOWN2h 42m 39s4h 17m 13s
    Belt 3 · Stator — DOWN2h 42m 35s4h 16m 33s
    Manpower (required 4 staff + 1 operator)
    At least 4 staff visible1h 59m 14s29m 54s
    Fewer than 4 staff visible9h 58m 55s11h 29m 15s
    Exactly 2 staff visible3h 15m 59s5h 18m 54s
    No person in operator area7h 18m 40s8h 00m 31s
    35,377
    parts recorded across the two shifts
    76,274
    rotor recorded, 1–8 October 2026
    70,363
    stator recorded, 1–8 October 2026
    • • DOWN = no recorded part crossing for 60 seconds. Belt intervals overlap and must not be added into a single machine-breakdown total.
    • • Camera-area gaps identify periods to review; they do not by themselves prove paid absence or its cause.
    • • Management action recorded against this evidence: verify deployment, arrange operator cover and investigate the stop windows.

    Every stop has a start and an end time

    ShiftAIDA 5Start (IST)End (IST)Duration
    DayBelt 17:00:00 AM7:22:10 AM0h 22m 10s
    DayBelt 27:00:00 AM7:21:58 AM0h 21m 58s
    DayBelt 37:00:00 AM7:22:05 AM0h 22m 05s
    NightBelt 110:03:14 PM11:26:17 PM1h 23m 03s
    NightBelt 210:03:14 PM11:28:40 PM1h 25m 26s
    NightBelt 310:03:14 PM11:28:49 PM1h 25m 35s

    Example intervals from 6 October 2026, shown to whole seconds; shift totals use the precise recorded durations.

    The operating loop

    Observe → supervisor review → recorded action

    Automation supplies the observations; the operating team records the reason and the response. The loop closes every shift.

    Automated observationSupervisor reviewAction to record
    Below required staff / empty operator areaCheck roster, breaks, redeployment and camera evidenceRestore cover or document the approved reason
    Extended machine / belt inactivityAsk the operator about breakdown, changeover or planned stopRecord cause, responsible owner and next step
    Hourly production counting variesReview material, staffing and stops for the same time windowAssign follow-up; check output in the next shift
    Attendance and deployment differReconcile named attendance with machine assignmentApprove allocation before calculating machine labour cost

    Shift-end WhatsApp summary

    At the end of each shift a summary with production counting, manpower gaps and downtime goes to the agreed WhatsApp group. The supervisor opens the evidence, discusses exceptions with the machine operator, aligns staff, confirms stop reasons and records the action for the next shift. Scheduled delivery is configured per group and shift timing.

    Two operating requirements the plant agreed to

    • Collection SOP. Rotor and stator parts are collected from the designated collection area, not directly from a belt. Direct pickups are flagged with camera evidence; the supervisor reviews the alert, briefs the shift team and reinforces the SOP.
    • Conveyor-change notification. Before moving, replacing or changing the belt arrangement: inform Proeffico → share the new layout → adjust monitoring areas → verify counts before routine reporting resumes.

    Saved example

    AIDA 5 | NIGHT SHIFT SUMMARY

    6 Oct, 7 PM – 7 Oct, 7 AM | IST

    • Production: 8,005 rotor | 7,892 stator
    • Staff below 4: 11h 29m 15s
    • Exactly 2 staff: 5h 18m 54s
    • Operator area empty: 8h 00m 31s
    • Belt 3 inactivity: 4h 16m 33s

    Action: verify staffing and operator cover; review stop reasons with the line team.

    What it means for inventory and cost

    Counted output you can reconcile, exceptions you can see

    Reconciliation

    The hourly and shift counts come from the camera, not from a manual tally, so they can be set beside the plan, the deployment record and the stop windows for the same time window — and beside approved payroll and allocation records to build machine-wise cost visibility.

    Leakage exceptions

    Parts are expected to follow one path: belt → designated collection area. Direct pickup from a belt breaks that path and is flagged with saved camera evidence for supervisor review. This is the evidence base for reconciling counted output; the POC does not claim a shrinkage or savings figure.

    Labour allocation

    Required 4 staff + 1 operator is compared with what the workforce camera observed, and named attendance is reconciled with machine assignment before machine labour cost is calculated. Where observed staff fall short, the first step is to verify where the other assigned staff were deployed — not to attribute a cost.

    FAQ

    Questions plant heads ask about this deployment

    What does VIZO361° count on the AIDA 5 press at Uttam Strips?

    Rotor and stator parts as they cross each conveyor belt — Belt 1 (rotor), Belt 2 and Belt 3 (stator). Counts are recorded per hour and per shift. Across the 6–7 October 2026 day and night shifts the system recorded 35,377 parts (9,891 rotor / 9,589 stator by day; 8,005 rotor / 7,892 stator by night), and 76,274 rotor / 70,363 stator across 1–8 October.

    How is machine downtime detected without connecting to the press PLC?

    From the conveyor camera. A belt is marked DOWN when no part crossing is recorded for 60 seconds, and every interval carries a clear start and end time in IST. It measures production inactivity, not a fault code, so the operator and line supervisor are asked to record the reason for each stop. Belt intervals overlap and are reported belt-wise — they are never summed into a single machine-breakdown figure.

    What does manpower monitoring with CCTV report?

    The required deployment for AIDA 5 is 4 staff plus 1 operator. The workforce camera reports how long at least 4 staff were visible in the monitored area, how long fewer than 4 were visible, and how long the designated operator area had no person in it. Staff-shortage alerts (for example, required 4 / detected 2) and operator-presence alerts (required 1 / detected 0 for 10 minutes) are raised during the shift. Camera-area gaps identify periods to review; they do not by themselves prove paid absence or its cause.

    How does this help with inventory reconciliation and cost in a stamping plant?

    The counted output is independent of manual tallies, so management can set it beside deployment, stop windows and the approved payroll and allocation records to build machine-wise cost visibility. Exceptions that break the expected part path — such as parts picked directly from a belt instead of the designated collection area — are flagged with camera evidence for the supervisor to review. The deck does not claim a savings figure; it provides the evidence base for the review.

    What does the plant team have to do for the counts to stay reliable?

    Two operating requirements: collect rotor and stator parts from the designated collection area rather than directly from the belt (the SOP alert flags direct pickups), and inform Proeffico before moving, replacing or changing the belt arrangement so monitoring areas can be adjusted and counts verified before routine reporting resumes.

    Want machine-wise visibility on your press line?

    Start with one machine and the cameras you already have: production counting, belt-wise downtime and required-vs-observed manpower from the first full shift.

    Book a Demo

    We value your privacy 🍪

    We use cookies to enhance your browsing experience, serve personalized content, and analyze our traffic. By clicking "Accept All", you consent to our use of cookies. Read our Cookie Policy and Privacy Policy.